Below you will find pages that utilize the taxonomy term “Data Centers”
South Korea's Lee Bets the Chip Tax Windfall on a 21.3 Trillion Won AI Budget
President Lee Jae Myung went to the National Assembly on Nov 2 2026 and asked lawmakers to pass the largest budget in South Korea’s history. The headline line is 21.3 trillion won, about $16 billion, for artificial intelligence and three named megaprojects: semiconductors, physical AI and AI data centers. Lee told parliament that is nearly twice this year’s amount.
The total budget is 820.9 trillion won, up 12.8% from the 727.9 trillion won approved for 2026. The government first published the proposal on Sept 1. Monday’s speech was the formal pitch. Lee’s Democratic Party holds a majority, and the statutory deadline for passage is Dec 2.
GAO Report on Nuclear Waste, Future Land Use Planning at Selected DOE Cleanup Sites
The Department of Energy is weighing nuclear fuel cycle hubs and AI data centers on land at its nuclear cleanup sites, and that is reopening an old question: what should the land be clean enough for? GAO reviewed six DOE cleanup sites and found that DOE and its regulators set cleanup levels to match the industrial, conservation or preservation uses planned decades ago. Residential use is rarely on the table, because cleaning land to that standard costs more.
AMD Q2 2026: The Gross Margin Guide Stayed at 56% and the Stock Lost 8%
Advanced Micro Devices beat on revenue, beat on earnings, beat on operating margin, and guided the September quarter about $500 million above consensus. The stock fell as much as 8% in after-hours trading, giving back a 7.7% regular-session gain that had carried it to roughly $513. It changed hands near $472.50 in the extended session, which puts the market capitalization just under $800 billion on a diluted share count of about 1.66 billion.
SpaceX (SPCX): Google's $30 Billion Compute Contract Is Cancellable on 90 Days' Notice
The number that carried SpaceX into the largest initial public offering in history was not a launch cadence figure. It was roughly $75 billion of contracted artificial intelligence revenue, assembled in the six weeks before the June 12 listing and presented to investors as the evidence that the company had become something more durable than a rocket manufacturer. Anthropic agreed in late May to pay $1.25 billion a month through May 2029 for exclusive access to the Colossus 1 facility outside Memphis. Google followed on June 5 with $920 million a month from October 2026 through June 2029 for approximately 110,000 Nvidia GPUs, plus the CPUs, memory and supporting infrastructure around them. Two customers, three-year terms, a combined backlog larger than the annual revenue of most S&P 500 constituents. The roadshow wrote itself.
TeraWulf's $19B Anthropic Lease Turns A Bitcoin Miner Into An AI Landlord
TeraWulf signed a 20-year lease with Anthropic for its Justified Data campus in Hawesville, Kentucky, a deal expected to generate approximately $19 billion in contracted revenue over the initial term. The announcement sent TeraWulf shares up more than 17% on the day — a striking outcome for a company that started life as a Bitcoin miner.
The scale of the campus. Justified Data is expected to support roughly 401 megawatts of critical IT load once fully built. Initial capacity comes online in the second half of 2027, with the site reaching full capacity by early 2028. That timeline matters: this is a multi-year commitment, not a near-term revenue bump, and the $19 billion figure averages out to roughly $950 million a year across the lease term, with actual cash flows depending on phased delivery and escalation terms.
Small Modular Reactors in the US: The 2026 Deployment Race
The US small modular reactor industry crossed a psychological threshold this year. No SMR has entered commercial operation domestically, but 2026 is shaping up as the year the first construction permits and criticality milestones actually land — and the trigger isn’t climate policy, it’s AI data-center power demand.
The Federal Push
The Department of Energy’s Gen III+ SMR Pathway to Deployment Program has become the primary vehicle for de-risking early builds. DOE issued a $900 million solicitation in March 2025, followed by $800 million in Tier 1 awards in December 2025 to the Tennessee Valley Authority and Holtec Government Services. In May 2026, DOE added a further $94 million across eight companies under Tier 2, targeting licensing, supply chain, and site preparation gaps that have historically stalled domestic nuclear projects.
Marvell (MRVL): The Trillion-Dollar Case Behind Huang's Computex Call
When Jensen Huang stood onstage with Matt Murphy at Computex in Taipei and called Marvell the next trillion-dollar company, the market did not treat it as a courtesy. The stock posted its largest single-day gain on record, jumping more than thirty percent the following session. Endorsements from rivals are usually cheap. This one was not, because Huang was not flattering a partner. He was describing the part of the AI buildout he understands better than anyone, and naming the company that owns it.
Marvell (MRVL) at $310: Its Israeli CTO Names the Bottleneck the Market Already Paid to Solve
Noam Mizrahi has been saying the same thing for two years, and the market has only just decided to believe him. Marvell’s corporate CTO, based at the company’s Israeli site and a Technion graduate, has argued since the early innings of the AI build-out that the constraint on the next leap was never going to be the processor. It was going to be the wire between the processors — and then the optics, when copper ran out of reach. The industry called this a backwater. Marvell bet the company on it. The bet has now compounded into one of the most violent re-ratings the semiconductor tape has produced this cycle.
Marvell's Path to a $1 Trillion Market Cap: The Revenue, Margin, and Timeline Math Behind the MRVL Bull Case
When Jensen Huang stood on the Computex stage and called Marvell a potential trillion-dollar company, it sounded like a courtesy extended to a new partner. It is not. It is a forecast with a visible arithmetic spine. Marvell closed near $325 in mid-June carrying a market capitalization around $272 billion. A trillion dollars is roughly 3.7 times that. The question is not whether the path exists. It exists, it is mapped, and Marvell’s own guidance lays most of the mileposts. The question is how many years it takes and what has to hold along the way.
Qualcomm and the AI Infrastructure Boom: A 62% Rally Ahead of the Revenue
Qualcomm has spent the better part of two years trying to convince the market it is something other than a smartphone modem company with a licensing book. As of June 2026, the market has decided to believe it — the stock is up roughly 62% in a single month and sits near $250, an all-time high. The harder question is whether the business has changed as fast as the multiple has.
AI Infrastructure Spending Enters a New Phase of Scale
The landscape of technology investment has undergone a structural transformation. As of March 2026, we are no longer witnessing a “surge” in spending; we are witnessing the construction of a new industrial base. What began as experimental pilot programs in 2023 and 2024 has matured into a multi-trillion-dollar replatforming of the global economy.
The Scale of the Buildout
The numbers defining this phase are staggering. Global AI spending is projected to exceed $2.5 trillion this year, with more than half of that—roughly $1.37 trillion—flowing directly into the foundational layers: servers, accelerators, and data center platforms.
AI Models Are Becoming Commodities, Infrastructure Is Not
The premise that AI models are becoming commodities while infrastructure is not reflects a seismic shift in the technological landscape, one that is becoming impossible to ignore as the underlying signals begin to converge. For years, the industry operated under the assumption that value resided almost exclusively in the intangible layers of the stack—the algorithms, the user interfaces, and the data. However, the current trajectory of artificial intelligence deployment has violently reattached software innovation to the heavy, uncompromising world of physical infrastructure. Data centers, localized energy grids, advanced cooling systems, and specialized networking capacity have ceased to be background logistics handled by IT departments; they are now the primary constraints of the modern era. In a competitive environment, constraints reshape corporate behavior far more rapidly than opportunity ever could, forcing a pivot from the ethereal back to the material.